ProSIM bags order for Seismic Qualification of Sea Water Desalination System for Kudankulum Nuclear Power Project (KKNPP) of NPCIL
ProSIM is excited to announce our new order for seismic qualification of Desalination System for KKNPP of NPCIL. Desalination is a process of removal of salt and mineral components from seawater water to provide clean water to the nuclear power plant (NPP)
Design verification by Finite Element Analysis (FEA), seismic qualification as per ASME B&PV nuclear codes, optimisation of system to ensure seismic qualification are part of the job order. All systems, structures, components (SSCs) of desalination plant of NPP are covered in the scope – including Boilers, Compressors, Pumps, Filtration system, Tanks, Valves, Piping System and Instruments etc.. Seismic Analysis will be carried out as per the guide lines of PP-1819-R1, AERB-SG-D-1, AERB-SG-D-23 and NPCIL technical specification. Codes used for the seismic evaluation are ASME, AERB, EN and IS codes
For more details about seismic analysis and qualification for nuclear power plants and to know more about ProSIM engineering desgin and consultancy services, contact enquiry@pro-sim.com